A Saudi company registered and insured to trade and employ Kingdom-wide, carrying field-systems and low-current packages as one contract.

Founders’ statement

The company was established to close a gap we have both worked around for years. On most projects, electrical, mechanical, low-current and instrumentation systems are bought as separate packages, and the client or main contractor absorbs the interface between them.

We formed the company to carry that interface ourselves: one contractor, one submittal register, one point of accountability from the sensor on the machine to the screen in the control room.

Between us we have worked both sides of the contract — terminal-scale ELV construction delivery, and giga-project client-side commercial control. We know what gets a submittal returned and what gets a payment application rejected, because we have issued both.

SYNFRA is 100% Saudi-owned. What we commit to is scope we can staff, programme dates we can hold, and documentation that does not come back.

Fahad AlsaabFounder & Managing Director
Site team in discussion

Company snapshot

Registered name
SynFra Company Commercial
Trading as
SYNFRA
Legal form
Limited liability company — single shareholder
Commercial register
7054826933 — issued 20 July 2026, active
Tax registration
TIN 3149126374 (ZATCA)
Social insurance
GOSI 661397985 — registered
National address
RUKA8884 — registered
Head office
Riyadh, Kingdom of Saudi Arabia
Area of operation
Kingdom-wide
Ownership
One Saudi shareholder — 100%
Managers
Fahad A. Alsaab · Yasser A. Alsaab

Registered activities include electrical installation; plumbing, heat and air-conditioning installation; other construction installation; and wholesale of electronic and telecommunications equipment.

Leadership

Fahad Alsaab

Founder & Managing Director Sole shareholder. Registered manager under the company’s articles of association.

Civil engineer and certified project management professional with giga-project delivery experience across urban development, infrastructure, sports, water and distribution sectors in the Kingdom. Experience spans the full project lifecycle — developing Employer’s Requirements, running tender processes, and directing design, construction, handover and defect liability. Direct working command of contract administration, payment certification, variations and authority approvals including Civil Defence and occupancy permits.

  • BSc Civil Engineering — The University of Toledo, Ohio
  • PMP — Project Management Professional
  • Member, Saudi Council of Engineers
  • Arabic and English

Yasser Abdullah Alsaab — Registered manager. Named as a manager in the company’s articles of association, with authority exercised individually.

Technical direction

More than twenty years of electrical, ELV and building-systems delivery across the GCC and beyond, with particular depth in electronic security and access control on airport terminals, government facilities and sports venues. Airport special systems are a core area — terminal MV, LV and ELV construction on projects exceeding 250,000 m², with interfaces to baggage handling, flight information and passenger screening. In transport infrastructure the same discipline covers highway and tunnel systems and railway signalling coordinated to ERTMS Level 2. Further depth in data centre delivery and in controls and automation: SCADA, BMS, IoT instrumentation, metering and EV charging.

Experience is described by sector, scale and function. References are provided at prequalification.

Capability matrix

IoT and control systems
Systems integration and interface engineeringSelf-perform
IoT devices, gateways and edge instrumentationSelf-perform
Sensor networks and field instrumentationSelf-perform
Energy metering, sub-metering and telemetrySelf-perform
SCADA and supervisory controlSelf-perform
Dashboards, alarms and operational reportingSelf-perform
Building management systems and controlsSupply & install
ELV, low current and security
Access control and credentialed entrySelf-perform
CCTV and video management systemsSelf-perform
Security operations centre integrationSupply & install
Intrusion detection and perimeter securitySupply & install
Structured cablingSelf-perform
Fire alarm, life safety and voice alarmManaged delivery
Electrical
LV distribution — boards, busway, submainsSelf-perform
Small power, lighting and lighting controlSelf-perform
Containment — tray, trunking, conduitSelf-perform
Earthing and lightning protectionSelf-perform
Data centre critical power and containmentSelf-perform
EV charging infrastructureSupply & install
Standby power — generators, UPSSupply & install
MV distribution — switchgear, RMUs, terminationsManaged delivery
Mechanical
Plumbing and drainageSelf-perform
Ducting and insulationSupply & install
HVAC — air handling, FCUs, ventilationManaged delivery
Chilled water — pipework, pumps, plantManaged delivery
Firefighting networks — sprinkler, hydrantManaged delivery

Self-perform — SYNFRA labour, supervision and testing. Supply & install — SYNFRA procures and installs; vendor commissions. Managed delivery — specialist resource working under SYNFRA contract, programme and control.

Registrations

Commercial Register7054826933Active
Zakat, Tax and VAT — ZATCATIN 3149126374Active
Social Insurance — GOSI661397985Registered
National Address — SPLRUKA8884Registered
ISO 9001 — Quality managementCertified
ISO 45001 — Occupational health and safetyCertified
ISO 14001 — Environmental managementCertified

Short-dated certificates are re-issued for each submission. Copies of the commercial register, articles of association, tax, social insurance and certification documents are provided with any prequalification pack.

Quality, health, safety and environment

SYNFRA works to the safety rules of the site it is on, or its own, whichever is stricter. Work stops on any unsafe condition without reference upward, and no operative is penalised for stopping it. Live electrical work is permitted only under written permit with isolation verified by a second competent person.

Incident reporting

First notification to the main contractor within 1 hour. Written preliminary report within 24 hours. Root cause analysis and corrective action within 7 days. Near-misses recorded on the same register as incidents.

Inspection and test plans

One ITP per system, agreed with the consultant before first fix. Hold points are not passed on verbal approval. Test records are signed at the point of test, not compiled retrospectively at handover.